- Preferred Labelskos:prefLabel
centreline dam
- URI
- https://pid.geoscience.gov.au/def/voc/ga/MiningWasteStructureType/centreline_dam ↗Go to the persistent identifier link
- Within Vocab
- Mineral Resources - Mining Waste Structure Type
Preferred Labelskos:prefLabel | centreline dam |
---|---|
Definitionskos:definition | Containment walls are constructed, usually in a series of stages, in a hybrid of upstream and downstream building methods. Construction begins with a starter dam, which forms the foundation for subsequent levels as the dam is raised. The dam wall remains fixed relative to upstream and downstream directions as the dam is sequentially built. |
See AlsoseeAlso | Mineral Resources - Mining Waste Structure Type |
History NotehistoryNote | This concept is used in a Geoscience Australia Mineral Resources database table (OZMIN.LU_WASTE_STRUCTURE_TYPES) |
Is Defined ByisDefinedBy | Mineral Resources - Mining Waste Structure Type |
Alternate Profiles
Different views and formats:
Alternate Profiles ?Profiles (alternative information views) encoded in various Media Types (HTML, text, RDF, JSON etc.) are available for this resource.